Pipeline Jobs: Coastal GasLink Line Spreads 3 and 4

Apply now to work for SA Energy

We are hiring for pipeline construction positions with SA Energy. The Coastal GasLink Pipeline will be used to carry Liquified Natural Gas (LNG) to Kitimat, where it will be exported to Asian markets. The project includes the construction of approximately 192 km of NDS 48” pipe.

All dispatches must undergo pre-access drug and alcohol testing.


To be eligible for dispatch, you must have the following certificates:

  • Ground Disturbance Supervisory Level II (GD2) – required for all dispatches
  • Pipeline Construction Safety Training (PCST) – required for all dispatches
  • And other job-related specifications may be required [Traffic Control Person (TCP), rigging, BC Fallers, coating, Utility Task Vehicle (UTV) ticket, etc.]

How to Apply

If you are not a current member of LiUNA Local 1611, and are interested in the work above, please email your resume with current tickets to resumes@cswu1611.org. Our training plan, Training PLUS, can provide the required certificates to those in need.


Training 

Questions about LiUNA Local 1611 training programs or certification? View our training calendar or email training@liuna1611.ca

Join LiUNA Local 1611

One team. One goal. Learn how LiUNA Local 1611 represents and protects our members at work. Become a member today.

A BETTER WORK ENVIRONMENT CAN CHANGE EVERYTHING! MAKE THAT CHANGE NOW.

Translate »